If you ’re recast to tot a bathroom to your basement , consider an upflush lavatory , which utilise an galvanic heart to get rid of waste .

Installing a new bathroom in a basement can be a major task . The concrete floor must be broken into and drainpipe install , then new concrete must be poured .

An upflushing unit have the Book of Job much easy . rather of using somberness to drain , an upflushing pot has a big - obligation ticker activate by a float and tack . When the low share of the tank fill , the pump turns on , forcing waste up through the 2 - inch drain . A 3 - inch vent is required . Make certain the release and drain conform tolocal plumbery codes .

blue bathroom, yellow ladder, ladder

Some upflushing building block , specially those installed in the ' 70s and ' 80s , were unreliable and needed frequent reparation . new unit are more true . Ask a plumbing system supplier about the track record of the model you are study . Make certain the unit ’s pump is powerful enough to send sewer water the required distance to the house ’s drainage .

An upflushing unit has a heavy - duty ticker activated by a float and switch . When the lower portion of the tank fill , the heart turns on , forcing wastefulness up through the 2 - in drain . A 3 - in vent is command . ensure the vent and debilitate conform to local bathymetry code .

You ’ll need roughly a day to set up the toilet . Get get going by purchase a whole , drawing a plan , and look up with a plumbing inspector to check that the plumbing will meet code .

SCP_250_11.jpg

What You’ll Need

Equipment / Tools

Materials

Instructions

Check the Depth

Before you choose a modelling and start installation , determine what type of upflush unit of measurement you ’ll need , based on the distance from the toilet line . A macerating toilet is utilitarian if a bath will be well below the sewer line of merchandise ( as much as 12 feet ) or if pipes must travel a long distance ( up to 150 feet ) before connect with the main cloaca line . A macerating toilet has a turn out sword that grinds thriftlessness before pumping it off . Macerating units have modest discharge and drainpipe . The flush cycle normally takes 15 to 18 seconds .

A macerating unit must be connected to a horizontal outlet john . Some manufacturers combine a toilet and pump . you’re able to opt between stand - alone macerate toilets and units with connexion for a tub / shower and a sink . ( With either type the tub / exhibitor must be raised to ease drain . )

Make a Base

This unit is designed to check between 2x6 - column inch joists . It must rest on a stable , fairly degree surface . If necessary , construct a simple 2x2 - inch frame , mix and pour grit - mix hydraulic concrete , and set the unit in the concrete . Level in both instruction . Allow the concrete to cure before legal proceeding .

Install the Support Flange

organize the unit for the toilet by installing the iron support rim . ensure that the toilet mount bolts are in the correct positions and are long enough for mounting the toilet .

Install the Pump

tack together the float substitution . add the discharge pipe . Place the pump in the tank and mount the float switch . Before sealing the building block , make certain the pump works . Attach a garden hose to a water supply and extend it into the rim hole .

Discharge Extra Water

Connect the venting to a drainpipe leading to a bucket or floor drain . Tape the temporary drainpipe joints — the pump is emphatic . Plug the unit into a GFCI receptacle . tardily fill up the tank with water . The pump should come on and empty body of water once it achieve the correct grade .

Install Vent Pipe

Insert the galosh flange provided and insert 3 - in PVC outlet pipe to the unit . ( It ’s a pixilated burst ; smooth soap helps . ) execute the vent to the primary sight . Be sure to configure the vent and drain in a code - okay manner .

Install the Backflow Device

Connect the discharge pipe to the backflowing twist to ensure that wastewater will not flow back into the building block . ( Be sure to set up it with the correct end up — it is clearly marked . ) Connect a 2 - inch PVC drainpipe to the sack whole and fly the coop it toward the house ’s drain in a code - approved manner .

Connect the Pipes

tie thedrain and vent pipesto the house ’s system of rules . secure the unit into a GFCI receptacle within reach of the admittance panel . deploy the supply melodic line . instal the subfloor and walls , being deliberate not to puncture the tank with any fixing .

Install the Toilet

Finish the level and walls and establish the access panel . add the toiletonto a wax ring where the bowl rests on the upflush whole . Connect the can to a cold water supply line with a stoppage valve .

Connect Other Features

Additional bathymetry secureness — unremarkably a tub / shower and a sump — can be connect to an upflush unit . waste pipe for these fixture must flow down to the upflush social unit .

This does not pose a problem for the sinkhole , because its drain is usually 16 in above the floor . The tubful , however , normally must be raised so the drainage line can menstruate down to the upflush unit of measurement . One resolution is to rest the bath on a shallow weapons platform made of 2x4s and plyboard . release pipes must be function in the stock fashion .

SCP_249_03.jpg

SCP_249_04.jpg

SCP_250_05.jpg

SCP_250_06.jpg

SCP_250_07.jpg

SCP_251_08.jpg

SCP_251_09.jpg

SCP_251_10.jpg

SCP_251_12.jpg